For investors
The low-voltage grid is where electrification is won or lost.
Every heat pump, charger and rooftop array lands on the last mile of the network. Operators need to connect more of it without rebuilding the grid, and today they cannot see that part.
Why now.
The four things a distribution company has to do next:
- Connect more without rebuilding the network.
- Spend less on reinforcement.
- Run flexibility with confidence.
- Give the regulator evidence.
All four depend on seeing the low-voltage network. Confidence drives investment decisions.
In 2020 the EU had 4.4 million utility transformers in service, and 98% of them work in distribution.
What already exists.
- A sensor family for secondary substations, poles and kiosks, built around a clamp-on current sensor.
- An operations platform: monitoring, incidents, compliance cases, shift handover and reporting.
- The fleet layer that critical infrastructure needs: per-device identity, mobile connectivity and over-the-air updates.
Next, a grid that reasons.
AI that models how the network behaves and sees constraints forming before they become faults or refused connections.
The team.
- SampleNameRole
- SampleNameRole
- SampleNameRole
- SampleNameRole
- SampleNameRole
Sample slots: each person decides their name, role and photo.
Request the investor briefing →